VRA to provide additional 260 megawatts of power.
As part of measures to provide stable and adequate power, the Volta River Authority is to provide an additional installed capacity of 260 megawatts of power to the national grid by November. VRA Currently, the existing install capacity of the Tema thermal power complex is 350...
Posted On 27 Jul 2015